Runoff Diversion Fact Sheet
What is a Runoff Diversion?
A Runoff Diversion (Figure 1) consists of a channel and dike or ridge
constructed across the slope to collect and divert runoff. The earthen channel
may remain bare, or when necessary to protect it from erosion it will be lined
with vegetation, turf reinforcement mats, or rock. The purpose of this practice
is to divert excess surface water from one area for use or safe disposal in
other areas.

Figure 1 - Typical Runoff Diversion Cross Section
When is a Runoff Diversion Used?
This practice applies to areas where runoff can be diverted and disposed of
safely to prevent flood damage, erosion, or sedimentation damage. Specific
locations and conditions include:
- Above steep slopes to limit surface runoff onto the slope;
- Across long slopes to reduce slope length to prevent gully erosion;
- Below steep grades where flooding, seepage, or sediment depositions mayoccur;
- Around buildings or areas that are subject to damage from runoff.
How are Runoff Diversions Designed?
Diversions should be designed by an experienced engineer or technician.
Important design considerations include:
Capacity. Diversion channels designed to protect areas such
as minor buildings and roads, shall have enough capacity to carry the peak
runoff expected from a 25-year frequency, 24-hour duration storm. Diversions
designed to protect major structures, homes, school buildings and high capacity
roads shall have enough capacity to carry the peak runoff from a 100-year
frequency 24-hour duration storm.
Channel Shape. The channel may be parabolic, V-shaped, or
trapezoidal in shape. Channel side slopes should be stable and not be steeper
than 3:1. A ridge placed on the downstream side of the channel must be high
enough to keep the runoff in the channel without overtopping. The ridge height
should provide at least 6 inches of freeboard and a settlement allowance of 10%.
The ridge shall have a minimum top width of 4 feet
Channel Slope. Runoff Diversion channels must be graded to
prevent water standing long enough to drown vegetation in the channel. If
possible design velocities greater than 1.5 feet per second should be used to
avoid sediment accumulation in the channel. Steeply sloped channels that
generate flow velocities greater than 2.5 feet per second will require some type
of lining.
Channel Lining. Channel lining materials may include one or
a combination of the following materials: vegetation, synthetic erosion control
mats(ECM) or turf reinforcement mats (TRM), rock or concrete, as determined by
an experienced designer. The following table may be used as a guide:
Max. Design Velocity (feet per second) |
Channel Slope (percent) |
Recommended Lining Material
|
< 2.5 |
< 0.5% |
|
2.5 - 4.5 |
< 2% |
|
>4.5 |
< 10% |
|
> 4.5 |
> 10% |
|
Outlets. Diversion channels must be able to deliver the
runoff to a stable outlet, at a point where outflow will not cause damage. Some
type of outlet structure or special lining over the outlet section of the
diversion channel may be required.
How are Runoff Diversions Maintained?
Runoff Diversions should be inspected after every major rainfall. Any needed
repairs to the channel, lining or dike must be made promptly. Maintenance
efforts must be adequate to preserve diversion capacity, ridge height, lining
integrity, and outlet stability.
|